Located in the Olney neighborhood of Philadelphia, the SEPTA R8 Fox Chase Line facility now has a somewhat resurrection story in its 100-year history. Originally constructed by the Reading Company in 1906, Olney Station was decommissioned when SEPTA ceased allowing customers to use it in the 1980’s. Several decades later, in June of 2008, the station was demolished to make way for a new facility with high-level platforms. What the site soon realized in its resurrection is that building requirements have changed dramatically over the past century, most notably those pertaining to stormwater management.

What would have been an impossible task for a small site that hosts some 60 parking spaces has become possible with the advent of underground storage systems. Over the past couple of decades, the traditional detention pond has given way to buried stormwater management systems (SWMS) that preserve the operational functionality of the much-needed space in the heart of urban development, or, in this case, urban redevelopment. In this vein, corrugated steel pipe (CSP) has found new life as well as the leading option available for engineering designers availing themselves of the strength, service life, constructibility, and size range afforded by this engineering material.

SEPTA’s multidisciplinary engineering department provided cradle-to-grave site development, from conceptual design through construction management. The reviewing agency responsible for stormwater management was the Philadelphia Water Department, which quickly assigned a restricted storm water discharge to mitigate an outlet that had become overtaxed through the years. The restricted storm water discharge assignment necessitated a detention requirement in excess of 15,000 cubic feet. With limited area to accommodate this amount of storage, SEPTA engineers decided on a 7’ diameter CSP SWMS with an overall dimensional footprint of 94’ x 37’ (photo above shows system at full width and one-third its final length).

Of particular interest is the type of CSP specified by the SEPTA design engineers – Polymer Coated CSP. Polymer-coated CSP was selected for its 100-year design service life, which coincides with the facility’s historical design life. Of the three major coating types available in the CSP market today (galvanized, aluminized and polymerized), polymer coated CSP provides the greatest service life and is the premier coating available today for CSP.

The polymer coating consists of a 10-mil polymer film laminated to both sides of a galvanized steel coil prior to the pipe manufacturing process. The TRENCHCOAT™ Protective Film is a tough, rugged polyolefin laminate that provides galvanized CSP with a durable barrier that exceeds the corrosion and abrasion resistance of all other coatings, with the added feature of providing an estimated service life of 100 years for the SEPTA project. Trademark of The Dow Chemical Company.

Another feature of utilizing CSP for underground storage purposes is the ability of the pipe manufacturer to fabricate fittings, manifolds, access risers, flow control structures, as well as any other appurtenances needed to support the hydraulic functions or maintenance of the system. Fabrication is accomplished with experienced welders using the very material specified for the SWMS, in this case a 7’ diameter polymer-coated CSP.

To provide the most efficient use of the available storage and minimize potential clogging and related maintenance demands, a 3” conical Reg-U-Flo® Vortex Valve (RVV) was used to meet the discharge limit requirements. The RVV is a rugged self-regulating flow control device made with 304 stainless steel. As part of the detention system’s outlet the valve was easily fastened to a 7’ diameter bulkhead.

Unlike an orifice, vortex control increases as the pressure builds having little control initially and maximum control once the design head is reached. This unique feature allows the RVV to be oversized without exceeding the discharge limit when the system is full. In this case, a 3” orifice would have exceeded the allowable rate at a system depth of 10 inches, while the 3” RVV does not exceed the allowable rate for the full range of storage depth available in the system.

The SWMS was easily assembled as pieces were delivered from the manufacturer, Lane Enterprises, from their nearby King of Prussia, PA facility located less than twenty miles from the project site. A just-in-time delivery procedure helped manage a very space-limited site and allowed the contractor, D’Angelo Bros., to better manage ingress and egress from one end of the site to the other.

Aside from providing customer parking, SEPTA’s construction management team was able to maintain functionality of the Olney Station for its users as evidence of the station’s need presented itself with the numerous neighborhood residents walking to and from the site throughout each day during the construction process. A resurrected facility teeming with new life to mark a century of use ~ 100-yr. pipe for a 100-yr. facility.